Screening Plant SP 7 — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
08/11/2010 08/11/2010 Rupp Construction Co., Inc. 1.75 1
08/04/2008 08/04/2008 Rupp Construction Co., Inc. 4.50 1
06/12/2007 06/12/2007 Rupp Construction Co., Inc. 0.50 1