Shamrock Loadout — Inspections
Total: 20 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 07/11/2007 | 07/11/2007 | J & L Drilling, Inc | 2.50 | 1 |
| 02/20/2007 | 03/30/2007 | J & L Drilling, Inc | 4.00 | 1 |
| 06/13/2006 | 06/13/2006 | J & L Drilling, Inc | 4.00 | 1 |
| 10/25/2005 | 10/26/2005 | J & L Drilling, Inc | 7.00 | 1 |
| 08/22/2005 | 09/14/2005 | J & L Drilling, Inc | 7.00 | 1 |
| 01/19/2005 | 03/31/2005 | J & L Drilling, Inc | 23.50 | 1 |
| 09/30/2004 | 10/04/2004 | J & L Drilling, Inc | 10.00 | 1 |
| 09/29/2004 | 09/29/2004 | J & L Drilling, Inc | 4.00 | 1 |
| 09/20/2004 | 09/20/2004 | J & L Drilling, Inc | 3.50 | 1 |
| 07/14/2004 | 09/14/2004 | J & L Drilling, Inc | 16.50 | 1 |
| 03/02/2004 | 03/05/2004 | J & L Drilling, Inc | 15.00 | 2 |
| 01/06/2004 | 01/06/2004 | J & L Drilling, Inc | 2.00 | 1 |
| 11/04/2003 | 11/04/2003 | J & L Drilling, Inc | 1.50 | 1 |
| 07/28/2003 | 07/30/2003 | J & L Drilling, Inc | 3.00 | 1 |
| 06/05/2003 | 06/05/2003 | J & L Drilling, Inc | 9.00 | 1 |
| 03/04/2003 | 03/06/2003 | J & L Drilling, Inc | 13.00 | 1 |
| 10/21/2002 | 10/23/2002 | J & L Drilling, Inc | 15.00 | 1 |
| 10/21/2002 | 10/23/2002 | J & L Drilling, Inc | 8.00 | 1 |
| 10/09/2002 | 10/09/2002 | J & L Drilling, Inc | 3.00 | 1 |
| 09/05/2002 | 09/10/2002 | J & L Drilling, Inc | 13.00 | 1 |