Shisler Rd. Pit — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 10/30/2024 | 10/31/2024 | Zoladz Construction Co.,Inc | 9.25 | 1 |
| 09/11/2024 | 09/11/2024 | Zoladz Construction Co.,Inc | 8.50 | 1 |
| 03/14/2024 | 03/14/2024 | Zoladz Construction Co.,Inc | 3.25 | 1 |
| 09/12/2023 | 09/12/2023 | Zoladz Construction Co.,Inc | 5.75 | 1 |