Key Takeaway
Sooner Stone is a abandoned surface mine producing Stone, located in Porum, Muskogee County, OK. It has 0 violations on record (0 S&S) and $0 in proposed penalties. Operated by Sooner Stone LLC.
Sooner Stone
Operator: Sooner Stone LLC
Controller: Martin E Shearwood; Brent Shearwood
Location: Porum, Muskogee County, OK
Inspections
View all 1 →| Begin | End | Hours | Inspectors |
|---|---|---|---|
| 03/21/2007 | 03/21/2007 | 4.50 | 1 |
Mine Details
Related Mines
Frequently Asked Questions
How many MSHA violations does Sooner Stone have?
Sooner Stone has 0 MSHA violations on record, of which 0 are classified as Significant & Substantial (S&S). Total proposed penalties amount to $0.
What type of mine is Sooner Stone?
Sooner Stone is a Surface mine producing Stone, located in Porum, Muskogee County, OK. It currently has 0 employees.
Has anyone been injured or killed at Sooner Stone?
According to MSHA records, Sooner Stone has 0 reported accident/injury records and 0 fatalities on file.
Who operates Sooner Stone?
Sooner Stone is operated by Sooner Stone LLC and controlled by Martin E Shearwood; Brent Shearwood. MSHA Mine ID: 3402019.