Sourdough Pit — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
10/04/2010 10/04/2010 Loren Ellison 2.00 1
04/26/2010 04/27/2010 Loren Ellison 5.50 1
03/25/2010 03/25/2010 Loren Ellison 13.50 1