Southern Portable 1 — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
10/01/2025 10/01/2025 Shelly Materials, Inc. 11.00 1
10/03/2024 10/03/2024 Shelly Materials, Inc. 10.50 1
03/18/2024 03/20/2024 Shelly Materials, Inc. 23.25 1