Staker Pit — Inspections

Total: 9 inspections

Begin End Operator Hours Inspectors
07/08/2021 07/08/2021 Miller Materials Inc 8.75 1
10/20/2020 10/20/2020 Miller Materials Inc 7.00 1
06/25/2020 06/26/2020 Miller Materials Inc 18.50 1
05/05/2020 05/05/2020 Miller Materials Inc 4.25 1
06/12/2019 06/12/2019 Miller Materials Inc 8.50 1
05/06/2019 05/08/2019 Miller Materials Inc 27.00 1
01/15/2019 01/15/2019 Miller Materials Inc 2.50 1
07/17/2018 07/17/2018 Miller Materials Inc 16.75 1
07/10/2018 07/11/2018 Miller Materials Inc 33.50 1