Stone Plant — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
09/02/2014 09/02/2014 Beaverton Security Excavating 4.25 1
08/27/2013 08/27/2013 Beaverton Security Excavating 5.25 1
11/08/2012 11/08/2012 Beaverton Security Excavating 4.50 1
10/01/2012 10/01/2012 Beaverton Security Excavating 3.50 1
09/26/2012 09/26/2012 Beaverton Security Excavating 3.50 1
09/18/2012 09/19/2012 Beaverton Security Excavating 30.25 1