Strip Pit 1 And 2 — Inspections

Total: 12 inspections

Begin End Operator Hours Inspectors
11/04/2003 11/04/2003 Jericol Mining Inc 1.00 1
11/04/2003 11/04/2003 Jericol Mining Inc 1.00 1
09/24/2003 03/31/2005 Jericol Mining Inc 18.00 1
08/05/2003 08/05/2003 Jericol Mining Inc 3.50 1
11/26/2002 11/27/2002 Jericol Mining Inc 1.00 1
11/25/2002 11/25/2002 Jericol Mining Inc 0.50 1
09/17/2002 09/17/2002 Jericol Mining Inc 2.50 1
05/23/2002 05/24/2002 Jericol Mining Inc 2.50 1
03/06/2002 03/07/2002 Jericol Mining Inc 3.50 1
04/23/2001 04/23/2001 Jericol Mining Inc 3.00 1
10/25/2000 10/25/2000 Jericol Mining Inc 1.00 1
09/19/2000 09/19/2000 Jericol Mining Inc 2.00 1