STRIPPING CREW — Inspections

Total: 21 inspections

Begin End Operator Hours Inspectors
01/13/2010 01/15/2010 Vulcan Constr. Materials, L.P. 15.00 1
04/27/2009 04/30/2009 Vulcan Constr. Materials, L.P. 6.00 1
12/11/2008 12/15/2008 Vulcan Constr. Materials, L.P. 13.50 1
03/31/2008 04/01/2008 Vulcan Constr. Materials, L.P. 13.00 1
02/06/2008 02/07/2008 Vulcan Constr. Materials, L.P. 11.00 1
10/19/2006 10/20/2006 Vulcan Constr. Materials, L.P. 6.00 1
10/19/2006 10/20/2006 Vulcan Constr. Materials, L.P. 1.00 1
01/19/2006 01/20/2006 Vulcan Constr. Materials, L.P. 23.00 2
08/08/2005 08/10/2005 Vulcan Constr. Materials, L.P. 21.00 1
01/20/2005 01/20/2005 Vulcan Constr. Materials, L.P. 11.00 2
09/21/2004 09/22/2004 Vulcan Constr. Materials, L.P. 16.00 1
09/21/2004 09/22/2004 Vulcan Constr. Materials, L.P. 4.00 1
01/28/2004 01/29/2004 Vulcan Constr. Materials, L.P. 24.00 1
02/06/2003 02/07/2003 Vulcan Constr. Materials, L.P. 13.00 1
10/23/2002 10/23/2002 Vulcan Constr. Materials, L.P. 1.00 1
06/25/2002 06/26/2002 Vulcan Constr. Materials, L.P. 21.00 1
11/06/2001 11/06/2001 Vulcan Constr. Materials, L.P. 10.00 1
06/05/2001 06/06/2001 Vulcan Constr. Materials, L.P. 13.00 1
11/08/2000 11/09/2000 Vulcan Constr. Materials, L.P. 13.00 1
07/26/2000 07/27/2000 Vulcan Constr. Materials, L.P. 15.00 1
04/04/2000 04/05/2000 Vulcan Constr. Materials, L.P. 27.00 1