Surface Mine #1 — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
05/31/2001 06/06/2001 Candle Ridge Mining Inc 18.00 1
01/26/2001 01/26/2001 Candle Ridge Mining Inc 7.00 1
01/26/2001 01/26/2001 Candle Ridge Mining Inc 7.00 1
01/09/2001 01/11/2001 Candle Ridge Mining Inc 20.00 1
07/10/2000 07/10/2000 Candle Ridge Mining Inc 12.00 1
07/10/2000 07/10/2000 Candle Ridge Mining Inc 3.50 1
06/28/2000 06/30/2000 Candle Ridge Mining Inc 16.00 1