Swapp Custom Crushing Plant #3 — Inspections

Total: 27 inspections

Begin End Operator Hours Inspectors
01/22/2026 01/23/2026 Swapp Construction Inc 13.00 1
07/22/2025 07/23/2025 Swapp Construction Inc 10.00 1
03/05/2025 03/06/2025 Swapp Construction Inc 9.00 1
07/30/2024 07/31/2024 Swapp Construction Inc 9.50 1
03/05/2024 03/07/2024 Swapp Construction Inc 4.00 1
08/01/2023 08/02/2023 Swapp Construction Inc 6.50 1
02/23/2023 02/24/2023 Swapp Construction Inc 9.00 1
05/08/2022 05/08/2022 Swapp Construction Inc 7.75 1
03/25/2022 03/25/2022 Swapp Construction Inc 7.75 1
07/27/2021 07/27/2021 Swapp Construction Inc 5.50 1
02/01/2021 02/05/2021 Swapp Construction Inc 7.50 1
02/01/2021 02/02/2021 Swapp Construction Inc 9.50 1
12/08/2020 12/09/2020 Swapp Construction Inc 1.00 1
06/03/2020 06/03/2020 Swapp Construction Inc 3.50 1
02/03/2020 02/05/2020 Swapp Construction Inc 6.00 1
07/30/2019 07/31/2019 Swapp Construction Inc 7.25 1
09/20/2016 09/21/2016 Swapp Construction Inc 16.50 1
08/10/2016 08/10/2016 Swapp Construction Inc 2.50 1
08/09/2016 08/10/2016 Swapp Construction Inc 9.75 1
03/28/2013 03/29/2013 Swapp Construction Inc 9.75 1
09/24/2012 09/25/2012 Swapp Construction Inc 14.00 1
05/08/2012 05/08/2012 Swapp Construction Inc 10.00 1
01/19/2011 01/19/2011 Swapp Construction Inc 1.50 1
10/22/2008 10/22/2008 Swapp Construction Inc 4.25 1
11/01/2007 11/01/2007 Swapp Construction Inc 16.00 1
06/05/2007 06/06/2007 Swapp Construction Inc 18.50 1
03/20/2007 03/22/2007 Swapp Construction Inc 7.75 1