SWEET LAKE PIT — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 12/06/2001 | 12/06/2001 | Roy Bailey Construction Inc | 5.00 | 1 |
| 04/17/2001 | 04/18/2001 | Roy Bailey Construction Inc | 4.00 | 1 |
| 02/23/2001 | 02/23/2001 | Roy Bailey Construction Inc | 5.00 | 1 |
| 12/19/2000 | 12/21/2000 | Roy Bailey Construction Inc | 8.00 | 1 |