TEC Site1 — Inspections
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 11/08/2012 | 11/15/2012 | Triton Energy Coal, Inc. | 14.75 | 2 |
| 09/27/2012 | 09/27/2012 | Triton Energy Coal, Inc. | 7.00 | 1 |
Total: 2 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 11/08/2012 | 11/15/2012 | Triton Energy Coal, Inc. | 14.75 | 2 |
| 09/27/2012 | 09/27/2012 | Triton Energy Coal, Inc. | 7.00 | 1 |