TELESCREEN PLANT — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
09/23/2004 09/23/2004 Alan Dorr Contracting 2.00 1
06/03/2003 06/03/2003 Alan Dorr Contracting 7.00 1
10/31/2002 10/31/2002 Alan Dorr Contracting 7.00 1
08/16/2001 08/16/2001 Alan Dorr Contracting 8.00 1
09/21/2000 09/21/2000 Alan Dorr Contracting 7.00 1