Telesmith Plant — Inspections
Total: 3 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 09/18/2025 | 09/18/2025 | Avail Valley Construction Wy L... | 7.00 | 1 |
| 09/09/2024 | 09/09/2024 | Avail Valley Construction Wy L... | 7.00 | 1 |
| 09/19/2023 | 09/21/2023 | Avail Valley Construction Wy L... | 22.50 | 1 |