Telsmith Plant #1 — Inspections
Total: 26 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 08/07/2018 | 08/07/2018 | Switzer Sand & Gravel, Inc. | 2.75 | 1 |
| 06/13/2017 | 06/14/2017 | Switzer Sand & Gravel, Inc. | 12.50 | 1 |
| 07/05/2016 | 07/05/2016 | Switzer Sand & Gravel, Inc. | 7.50 | 1 |
| 02/10/2016 | 02/10/2016 | Switzer Sand & Gravel, Inc. | 7.75 | 1 |
| 07/06/2015 | 07/06/2015 | Switzer Sand & Gravel, Inc. | 9.75 | 1 |
| 03/11/2015 | 03/11/2015 | Switzer Sand & Gravel, Inc. | 9.50 | 1 |
| 03/10/2015 | 03/11/2015 | Switzer Sand & Gravel, Inc. | 14.75 | 1 |
| 11/20/2013 | 11/20/2013 | Switzer Sand & Gravel, Inc. | 11.50 | 1 |
| 09/17/2013 | 09/17/2013 | Switzer Sand & Gravel, Inc. | 15.00 | 1 |
| 06/18/2013 | 06/20/2013 | Switzer Sand & Gravel, Inc. | 8.50 | 1 |
| 05/22/2013 | 05/22/2013 | Switzer Sand & Gravel, Inc. | 9.75 | 1 |
| 04/16/2013 | 04/16/2013 | Switzer Sand & Gravel, Inc. | 1.75 | 1 |
| 05/09/2012 | 05/10/2012 | Switzer Sand & Gravel, Inc. | 8.50 | 1 |
| 10/26/2011 | 10/26/2011 | Switzer Sand & Gravel, Inc. | 1.75 | 1 |
| 05/10/2011 | 05/10/2011 | Switzer Sand & Gravel, Inc. | 9.00 | 2 |
| 05/10/2010 | 05/11/2010 | Switzer Sand & Gravel, Inc. | 12.00 | 1 |
| 04/15/2009 | 04/15/2009 | Switzer Sand & Gravel, Inc. | 25.50 | 2 |
| 05/28/2008 | 05/28/2008 | Switzer Sand & Gravel, Inc. | 9.00 | 1 |
| 06/27/2007 | 06/27/2007 | Switzer Sand & Gravel, Inc. | 5.50 | 1 |
| 06/27/2006 | 06/29/2006 | Switzer Sand & Gravel, Inc. | 11.00 | 1 |
| 04/26/2005 | 04/26/2005 | Switzer Sand & Gravel, Inc. | 6.50 | 1 |
| 08/04/2004 | 08/04/2004 | Switzer Sand & Gravel, Inc. | 11.00 | 1 |
| 09/16/2003 | 09/16/2003 | Switzer Sand & Gravel, Inc. | 8.00 | 1 |
| 09/17/2002 | 09/17/2002 | Switzer Sand & Gravel, Inc. | 8.00 | 1 |
| 07/11/2001 | 07/11/2001 | Switzer Sand & Gravel, Inc. | 6.00 | 1 |
| 05/02/2000 | 05/02/2000 | Switzer Sand & Gravel, Inc. | 14.00 | 1 |