Tennessee Mine — Inspections
Total: 5 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 01/28/2013 | 01/28/2013 | Hondo Minerals Inc | 5.75 | 1 |
| 01/09/2013 | 01/15/2013 | Hondo Minerals Inc | 36.00 | 1 |
| 10/10/2012 | 10/10/2012 | Hondo Minerals Inc | 13.00 | 1 |
| 06/13/2012 | 06/13/2012 | Hondo Minerals Inc | 2.50 | 1 |
| 05/15/2012 | 05/17/2012 | Hondo Minerals Inc | 27.25 | 1 |