Terex-Finley 1540C Portable Cone — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 10/16/2024 | 10/17/2024 | Presby Construction Inc. | 3.00 | 1 |
| 08/14/2024 | 08/15/2024 | Presby Construction Inc. | 1.25 | 1 |
| 08/04/2024 | 08/06/2024 | Presby Construction Inc. | 5.25 | 1 |
| 05/22/2023 | 05/23/2023 | Presby Construction Inc. | 12.75 | 1 |