Thomas Mine #4 — Inspections

Total: 27 inspections

Begin End Operator Hours Inspectors
03/02/2021 03/03/2021 Thomas Excavating L L C 3.00 1
04/01/2020 04/16/2020 Thomas Excavating L L C 26.50 1
10/16/2019 10/18/2019 Thomas Excavating L L C 11.50 1
07/18/2018 07/18/2018 Thomas Excavating L L C 4.00 1
03/01/2018 03/01/2018 Thomas Excavating L L C 5.50 1
03/20/2017 03/21/2017 Thomas Excavating L L C 15.50 1
04/04/2016 04/05/2016 Thomas Excavating L L C 6.00 1
03/23/2016 03/23/2016 Thomas Excavating L L C 7.50 1
04/21/2015 04/21/2015 Thomas Excavating L L C 10.00 1
03/24/2015 03/24/2015 Thomas Excavating L L C 4.00 1
05/19/2014 05/19/2014 Thomas Excavating L L C 5.00 1
01/28/2014 01/28/2014 Thomas Excavating L L C 4.00 1
11/18/2013 11/18/2013 Thomas Excavating L L C 9.50 1
10/22/2013 10/23/2013 Thomas Excavating L L C 18.75 1
10/16/2013 10/16/2013 Thomas Excavating L L C 6.00 1
01/08/2013 01/08/2013 Thomas Excavating L L C 6.00 1
05/23/2012 05/23/2012 Thomas Excavating L L C 3.25 1
07/19/2011 07/20/2011 Thomas Excavating 23.00 1
09/13/2010 09/13/2010 Thomas Excavating 2.75 1
08/25/2010 08/25/2010 Thomas Excavating 2.00 1
03/24/2010 03/24/2010 Thomas Excavating 4.50 1
02/03/2009 02/03/2009 Thomas Excavating 6.00 1
08/06/2008 08/07/2008 Thomas Excavating 10.50 1
02/06/2008 02/07/2008 Thomas Excavating 8.00 1
01/09/2008 01/10/2008 Thomas Excavating 4.00 1
09/04/2007 09/04/2007 Thomas Excavating 8.50 1
03/20/2007 03/21/2007 Thomas Excavating 8.00 1