Thomaston Plant — Inspections

Total: 13 inspections

Begin End Operator Hours Inspectors
12/29/2025 12/29/2025 Lappe Sand and Gravel, LLC 1.75 1
12/08/2025 12/15/2025 Lappe Sand and Gravel, LLC 22.75 1
04/08/2025 04/08/2025 Lappe Sand and Gravel, LLC 2.50 1
04/07/2025 04/08/2025 Lappe Sand and Gravel, LLC 9.25 1
11/20/2024 11/20/2024 Lappe Sand and Gravel, LLC 2.50 1
11/06/2024 11/07/2024 Lappe Sand and Gravel, LLC 10.00 1
11/05/2024 11/07/2024 Lappe Sand and Gravel, LLC 9.00 1
04/30/2024 04/30/2024 Lappe Sand and Gravel, LLC 1.25 1
07/31/2023 08/09/2023 South Texas Materials, LLC 2.00 1
10/24/2022 10/31/2022 South Texas Materials, LLC 26.25 1
06/07/2022 06/07/2022 South Texas Materials, LLC 6.75 1
03/16/2022 03/16/2022 South Texas Materials, LLC 9.50 1
08/18/2021 08/19/2021 South Texas Materials, LLC 13.25 1