Thompson South Mine — Inspections

Total: 20 inspections

Begin End Operator Hours Inspectors
07/24/2014 07/24/2014 Thompson South 1 LLC 3.00 1
10/08/2013 10/08/2013 Thompson South 1 LLC 5.25 1
07/30/2013 09/17/2013 Thompson South 1 LLC 12.00 2
02/14/2013 03/25/2013 Thompson South 1 LLC 42.75 3
10/15/2012 10/15/2012 Thompson South 1 LLC 2.00 1
08/28/2012 08/28/2012 Thompson South 1 LLC 2.00 1
08/02/2012 08/02/2012 Thompson South 1 LLC 12.00 1
07/11/2012 09/05/2012 Thompson South 1 LLC 21.75 1
03/26/2012 03/26/2012 Thompson South 1 LLC 15.00 1
02/22/2012 03/01/2012 Thompson South 1 LLC 34.00 2
12/07/2011 12/07/2011 Thompson South 1 LLC 4.50 1
06/18/2011 08/09/2011 M&B Excavating Co., Inc., LLC 27.00 3
02/08/2011 03/23/2011 M&B Excavating Co., Inc., LLC 23.00 2
11/09/2010 11/09/2010 M&B Excavating Co., Inc., LLC 3.00 1
07/08/2010 08/17/2010 M&B Excavating Co., Inc., LLC 48.25 3
02/16/2010 02/16/2010 M&B Excavating Co., Inc., LLC 2.25 1
09/23/2009 09/23/2009 M&B Excavating Co., Inc., LLC 1.50 1
02/26/2009 02/26/2009 M&B Excavating Co., Inc., LLC 0.50 1
06/30/2008 06/30/2008 M&B Excavating Co., Inc., LLC 2.00 1
03/11/2008 03/11/2008 M&B Excavating Co., Inc., LLC 2.00 1