Thumb Butte — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 02/20/2003 | 02/20/2003 | Tri R Construction, Inc. | 3.00 | 1 |
| 10/29/2002 | 10/30/2002 | Tri R Construction, Inc. | 16.00 | 1 |
| 10/22/2002 | 10/22/2002 | Tri R Construction, Inc. | 3.00 | 1 |
| 06/05/2002 | 06/13/2002 | Tri R Construction, Inc. | 24.00 | 1 |