Timberlane — Inspections

Total: 31 inspections

Begin End Operator Hours Inspectors
08/13/2025 08/13/2025 Scott Construction, Inc 3.50 1
08/22/2024 08/22/2024 Scott Construction, Inc 3.25 1
08/16/2024 08/16/2024 Scott Construction, Inc 10.75 1
05/25/2023 05/25/2023 Scott Construction, Inc 26.00 2
07/06/2022 07/06/2022 Scott Construction, Inc 3.00 1
06/13/2022 06/16/2022 Scott Construction, Inc 12.75 1
06/29/2021 06/30/2021 Scott Construction, Inc 10.50 1
08/26/2020 08/26/2020 Scott Construction, Inc 14.75 1
05/23/2019 05/23/2019 Scott Construction, Inc 8.75 1
02/26/2019 02/26/2019 Scott Construction, Inc 15.50 1
08/14/2018 08/14/2018 Scott Construction, Inc 14.25 1
04/24/2018 04/24/2018 Scott Construction, Inc 5.00 1
04/03/2018 04/03/2018 Scott Construction, Inc 1.75 1
04/03/2018 04/03/2018 Scott Construction, Inc 22.75 1
01/24/2018 01/25/2018 Scott Construction, Inc 17.00 1
06/06/2017 06/06/2017 Scott Construction, Inc 10.75 1
12/20/2016 12/20/2016 Scott Construction, Inc 15.50 1
10/06/2015 10/06/2015 Scott Construction, Inc 16.25 1
09/09/2015 09/09/2015 Scott Construction, Inc 16.75 1
12/04/2013 12/05/2013 Timberlane Excavating LLC 12.50 1
05/29/2013 05/29/2013 Timberlane Excavating LLC 6.25 1
04/17/2013 04/17/2013 Timberlane Excavating LLC 9.00 1
10/03/2012 10/03/2012 Timberlane Excavating LLC 1.50 1
04/19/2012 04/19/2012 Timberlane Excavating LLC 2.25 1
04/18/2012 04/19/2012 Timberlane Excavating LLC 17.25 1
07/12/2011 07/13/2011 Timberlane Excavating LLC 6.50 1
11/17/2009 11/19/2009 Timberlane Excavating LLC 27.00 1
05/06/2009 05/06/2009 Timberlane Excavating LLC 12.25 1
05/21/2008 05/21/2008 Timberlane Excavating LLC 10.75 1
05/21/2007 05/21/2007 Timberlane Excavating LLC 8.00 1
04/04/2007 04/04/2007 Timberlane Excavating LLC 1.00 1