Titan Power Screen — Inspections
Total: 7 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 09/17/2013 | 09/17/2013 | Holcim - MWR, Inc. | 1.00 | 1 |
| 08/23/2012 | 08/23/2012 | Holcim - MWR, Inc. | 0.50 | 1 |
| 06/22/2011 | 06/22/2011 | Holcim - MWR, Inc. | 2.00 | 1 |
| 07/21/2010 | 07/21/2010 | Holcim - MWR, Inc. | 3.00 | 1 |
| 08/19/2009 | 08/19/2009 | Holcim - MWR, Inc. | 6.00 | 1 |
| 07/22/2009 | 07/22/2009 | Holcim - MWR, Inc. | 0.75 | 1 |
| 07/01/2008 | 07/02/2008 | Holcim - MWR, Inc. | 6.50 | 1 |