T.J.S. No. 5 Mine — Inspections

Total: 63 inspections

Begin End Operator Hours Inspectors
04/04/2005 06/30/2005 T.J.S. Mining, Inc. 134.50 5
03/28/2005 03/31/2005 T.J.S. Mining, Inc. 7.00 1
03/23/2005 03/29/2005 T.J.S. Mining, Inc. 12.00 1
03/04/2005 03/29/2005 T.J.S. Mining, Inc. 43.00 1
02/14/2005 02/14/2005 T.J.S. Mining, Inc. 4.00 1
02/07/2005 02/07/2005 T.J.S. Mining, Inc. 8.00 1
01/11/2005 01/14/2005 T.J.S. Mining, Inc. 11.00 1
01/04/2005 01/05/2005 T.J.S. Mining, Inc. 12.00 1
01/04/2005 03/16/2005 T.J.S. Mining, Inc. 21.00 1
12/15/2004 12/30/2004 T.J.S. Mining, Inc. 32.00 1
12/07/2004 12/09/2004 T.J.S. Mining, Inc. 18.00 1
11/22/2004 11/22/2004 T.J.S. Mining, Inc. 8.00 1
09/28/2004 10/01/2004 T.J.S. Mining, Inc. 12.00 1