Todd Co Wash Plant — Inspections

Total: 28 inspections

Begin End Operator Hours Inspectors
06/23/2020 06/23/2020 Thull Construction 1.50 1
09/26/2019 09/26/2019 Thull Construction 1.75 1
06/17/2019 06/20/2019 Thull Construction 5.25 1
08/14/2018 08/16/2018 Thull Construction 7.50 1
07/26/2017 07/26/2017 Thull Construction 3.00 1
04/11/2016 04/11/2016 Thull Construction 2.25 1
03/22/2016 03/23/2016 Thull Construction 13.00 1
10/27/2015 10/27/2015 Thull Construction 3.00 1
11/19/2014 11/19/2014 Thull Construction 5.50 1
08/11/2014 08/11/2014 Thull Construction 6.50 1
08/07/2014 08/08/2014 Thull Construction 9.00 1
07/23/2013 07/23/2013 Thull Construction 3.75 1
08/08/2012 08/08/2012 Thull Construction 9.00 1
11/04/2010 11/04/2010 Thull Construction 9.50 1
06/28/2010 06/30/2010 Thull Construction 40.25 2
06/22/2009 06/25/2009 Thull Construction 12.25 1
05/28/2008 05/28/2008 Thull Construction 1.50 1
05/21/2008 05/21/2008 Thull Construction 3.25 1
11/15/2006 11/15/2006 Thull Construction 4.75 1
05/23/2006 05/23/2006 Thull Construction 7.00 1
05/18/2006 05/18/2006 Thull Construction 6.75 1
05/10/2005 05/10/2005 Thull Construction 8.25 1
04/13/2004 04/13/2004 Thull Construction 5.00 1
07/22/2003 07/22/2003 Thull Construction 4.00 1
07/17/2003 07/17/2003 Thull Construction 4.00 1
07/09/2003 07/10/2003 Thull Construction 10.00 1
10/26/2000 10/26/2000 Thull Construction 4.00 1
06/27/2000 06/27/2000 Thull Construction 16.00 1