Travis Creek #1 Mine — Inspections

Total: 5 inspections

Begin End Operator Hours Inspectors
03/20/2002 03/20/2002 Hunter Excavating Inc 6.00 1
05/16/2001 05/16/2001 Hunter Excavating Inc 8.00 1
02/21/2001 02/21/2001 Hunter Excavating Inc 8.00 1
08/02/2000 08/14/2000 Hunter Excavating Inc 8.00 1
01/21/2000 03/07/2000 Hunter Excavating Inc 27.00 1