Tunnel Ridge Mine — Inspections

Total: 1,519 inspections

Begin End Operator Hours Inspectors
04/28/2009 04/28/2009 Tunnel Ridge, LLC 15.00 2
04/16/2009 04/20/2009 Tunnel Ridge, LLC 31.75 2
04/08/2009 04/10/2009 Tunnel Ridge, LLC 9.00 1
03/19/2009 03/30/2009 Tunnel Ridge, LLC 43.75 2
03/02/2009 03/02/2009 Tunnel Ridge, LLC 8.00 1
02/25/2009 02/26/2009 Tunnel Ridge, LLC 18.00 2
01/09/2009 01/09/2009 Tunnel Ridge, LLC 3.50 1
12/16/2008 12/16/2008 Tunnel Ridge, LLC 7.00 1
11/24/2008 11/24/2008 Tunnel Ridge, LLC 5.25 1
10/28/2008 10/28/2008 Tunnel Ridge, LLC 13.00 2
10/28/2008 10/28/2008 Tunnel Ridge, LLC 19.50 2
09/17/2008 09/17/2008 Tunnel Ridge, LLC 9.00 1
08/27/2008 08/27/2008 Tunnel Ridge, LLC 6.00 2
07/03/2008 07/03/2008 Tunnel Ridge, LLC 17.50 2
06/25/2008 06/25/2008 Tunnel Ridge, LLC 5.00 1
06/04/2008 06/04/2008 Tunnel Ridge, LLC 17.50 2
12/28/2007 03/28/2008 Tunnel Ridge, LLC 9.50 1
11/14/2007 11/14/2007 Tunnel Ridge, LLC 21.00 3
06/28/2006 06/28/2006 Tunnel Ridge, LLC 5.00 1