Upland Plant — Inspections

Total: 28 inspections

Begin End Operator Hours Inspectors
11/23/2009 11/24/2009 CalMat Co 14.25 1
05/19/2009 05/21/2009 CalMat Co 26.75 1
01/28/2009 01/29/2009 CalMat Co 13.50 1
04/16/2008 04/18/2008 CalMat Co 17.50 1
12/20/2007 12/20/2007 CalMat Co 10.25 1
05/23/2007 05/23/2007 CalMat Co 15.00 1
05/08/2007 05/09/2007 CalMat Co 17.75 1
11/29/2006 11/30/2006 CalMat Co 9.50 1
11/27/2006 11/28/2006 CalMat Co 17.50 1
07/05/2006 07/06/2006 CalMat Co 17.00 1
05/18/2006 05/18/2006 CalMat Co 8.00 1
02/01/2006 02/02/2006 CalMat Co 19.50 1
08/11/2005 08/11/2005 CalMat Co 2.00 1
07/21/2005 07/21/2005 CalMat Co 4.00 1
03/29/2005 03/29/2005 CalMat Co 8.00 1
03/07/2005 03/10/2005 CalMat Co 28.00 1
08/20/2004 08/20/2004 CalMat Co 8.00 1
05/19/2004 05/19/2004 CalMat Co 7.00 1
04/13/2004 04/15/2004 CalMat Co 47.00 2
11/06/2003 11/06/2003 CalMat Co 4.00 1
11/03/2003 11/04/2003 CalMat Co 19.00 1
04/29/2003 05/01/2003 CalMat Co 0.00 0
10/02/2002 10/03/2002 CalMat Co 23.00 1
05/30/2002 05/31/2002 CalMat Co 10.00 1
01/03/2002 01/10/2002 CalMat Co 49.00 1
01/17/2001 01/18/2001 CalMat Co 28.00 2
01/05/2001 01/11/2001 CalMat Co 8.00 2
09/25/2000 09/27/2000 CalMat Co 20.00 1