VALENCIA — Inspections

Total: 10 inspections

Begin End Operator Hours Inspectors
11/02/2006 11/02/2006 CPC Southwest Materials Inc 4.50 1
06/12/2006 06/13/2006 CPC Southwest Materials Inc 6.50 1
08/17/2005 08/18/2005 Tucson Ready Mix Inc 9.00 1
11/18/2004 11/18/2004 Tucson Ready Mix Inc 8.00 1
07/07/2004 07/09/2004 Tucson Ready Mix Inc 7.00 1
03/02/2004 03/02/2004 Tucson Ready Mix Inc 10.00 1
04/17/2003 04/18/2003 Tucson Ready Mix Inc 16.00 2
08/21/2002 08/22/2002 Tucson Ready Mix Inc 7.00 1
04/19/2001 04/24/2001 Tucson Ready Mix Inc 17.00 2
03/02/2000 03/06/2000 Tucson Ready Mix Inc 7.00 1