Valley Creek Mine No. 3 — Inspections

Total: 18 inspections

Begin End Operator Hours Inspectors
04/04/2006 06/08/2006 Tennco, Inc. 17.00 2
01/23/2006 01/23/2006 Tennco, Inc. 7.00 2
10/11/2005 12/30/2005 Tennco, Inc. 5.00 1
07/11/2005 08/15/2005 Tennco, Inc. 102.50 2
05/06/2005 06/28/2005 Tennco, Inc. 120.00 1
04/27/2005 04/28/2005 Tennco, Inc. 11.00 1
03/09/2005 03/14/2005 Tennco, Inc. 5.50 1
01/19/2005 03/16/2005 Tennco, Inc. 72.00 1
01/03/2005 01/12/2005 Tennco, Inc. 12.00 2
12/28/2004 12/28/2004 Tennco, Inc. 8.00 1
10/04/2004 12/27/2004 Cooper Ridge LLC 143.00 5
07/19/2004 09/30/2004 Cooper Ridge LLC 89.50 4
06/29/2004 06/30/2004 Cooper Ridge LLC 3.00 1
06/07/2004 06/08/2004 Cooper Ridge LLC 6.00 1
05/04/2004 06/29/2004 Cooper Ridge LLC 112.00 5
04/29/2004 05/03/2004 Cooper Ridge LLC 11.00 1
02/02/2004 02/18/2004 Cooper Ridge LLC 53.50 3
01/29/2004 03/30/2004 Cooper Ridge LLC 117.00 3