Van Kennen Pit — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
05/28/2025 05/29/2025 Curran Logging, Inc. 17.00 1
08/27/2024 08/27/2024 Curran Logging, Inc. 1.00 1
10/03/2022 10/04/2022 Curran Logging, Inc. 7.75 1
09/01/2021 09/02/2021 Curran Logging, Inc. 17.00 1