Viper 302 Screen — Inspections
Total: 12 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 07/23/2013 | 07/23/2013 | Neiswonger Construction Inc | 4.25 | 1 |
| 03/05/2013 | 03/06/2013 | Neiswonger Construction Inc | 5.75 | 1 |
| 01/09/2012 | 01/10/2012 | Neiswonger Construction Inc | 10.50 | 1 |
| 09/21/2010 | 10/01/2010 | Neiswonger Construction Inc | 5.25 | 1 |
| 05/05/2010 | 05/06/2010 | Neiswonger Construction Inc | 10.75 | 1 |
| 06/29/2009 | 06/30/2009 | Neiswonger Construction Inc | 5.00 | 1 |
| 09/04/2008 | 09/05/2008 | Neiswonger Construction Inc | 7.50 | 1 |
| 05/06/2008 | 05/06/2008 | Neiswonger Construction Inc | 5.50 | 1 |
| 06/07/2007 | 06/07/2007 | Neiswonger Construction Inc | 6.25 | 1 |
| 03/28/2006 | 04/03/2006 | Neiswonger Construction Inc | 10.25 | 1 |
| 09/13/2005 | 09/13/2005 | Neiswonger Construction Inc | 3.25 | 1 |
| 06/28/2005 | 06/30/2005 | Neiswonger Construction Inc | 2.00 | 1 |