Wallingford Quarry — Inspections

Total: 55 inspections

Begin End Operator Hours Inspectors
07/10/2002 07/10/2002 Tilcon Connecticut Inc 6.00 1
04/17/2002 04/17/2002 Tilcon Connecticut Inc 2.00 1
04/09/2002 04/11/2002 Tilcon Connecticut Inc 31.00 1
02/12/2001 02/15/2001 Tilcon Connecticut Inc 33.00 1
04/19/2000 04/27/2000 Tilcon Connecticut Inc 46.00 1