Wash Plant #1 — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
07/20/2016 07/20/2016 Minn-Dak Asphalt, Inc 1.75 1
08/12/2015 08/12/2015 Minn-Dak Asphalt, Inc 2.00 1
07/07/2014 07/07/2014 Minn-Dak Asphalt, Inc 0.75 1
09/23/2013 09/23/2013 Minn-Dak Asphalt, Inc 0.75 1