Wash Plant 1 — Inspections
Total: 16 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 09/20/2012 | 09/20/2012 | A-1 Materials Inc | 14.50 | 1 |
| 11/01/2010 | 11/02/2010 | A-1 Materials Inc | 11.25 | 1 |
| 09/29/2010 | 09/29/2010 | A-1 Materials Inc | 9.00 | 1 |
| 07/26/2010 | 07/26/2010 | A-1 Materials Inc | 4.75 | 1 |
| 05/19/2009 | 05/20/2009 | A-1 Materials Inc | 19.00 | 1 |
| 11/05/2007 | 11/05/2007 | A-1 Materials Inc | 5.00 | 1 |
| 10/31/2007 | 10/31/2007 | A-1 Materials Inc | 7.75 | 1 |
| 05/02/2007 | 05/02/2007 | A-1 Materials Inc | 5.50 | 1 |
| 04/24/2007 | 04/25/2007 | A-1 Materials Inc | 14.00 | 1 |
| 04/18/2006 | 04/18/2006 | A-1 Materials Inc | 8.00 | 2 |
| 11/16/2004 | 11/17/2004 | A-1 Materials Inc | 11.00 | 1 |
| 01/20/2004 | 01/20/2004 | A-1 Materials Inc | 8.00 | 1 |
| 10/08/2003 | 10/08/2003 | A-1 Materials Inc | 8.00 | 1 |
| 10/28/2002 | 10/28/2002 | A-1 Materials Inc | 5.00 | 1 |
| 11/06/2001 | 11/07/2001 | A-1 Materials Inc | 34.00 | 1 |
| 05/02/2001 | 05/02/2001 | A-1 Materials Inc | 12.00 | 2 |