Wash Plant 2 — Inspections
Total: 19 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 10/29/2012 | 10/29/2012 | A-1 Materials Inc | 6.50 | 1 |
| 10/24/2012 | 10/24/2012 | A-1 Materials Inc | 11.25 | 1 |
| 10/17/2011 | 10/18/2011 | A-1 Materials Inc | 22.00 | 1 |
| 11/02/2010 | 11/02/2010 | A-1 Materials Inc | 4.50 | 1 |
| 06/22/2010 | 06/22/2010 | A-1 Materials Inc | 8.75 | 1 |
| 07/01/2009 | 07/01/2009 | A-1 Materials Inc | 6.50 | 1 |
| 10/23/2008 | 10/23/2008 | A-1 Materials Inc | 2.50 | 1 |
| 10/31/2007 | 10/31/2007 | A-1 Materials Inc | 3.25 | 1 |
| 10/05/2006 | 10/05/2006 | A-1 Materials Inc | 8.75 | 1 |
| 04/18/2006 | 04/18/2006 | A-1 Materials Inc | 6.00 | 2 |
| 04/11/2005 | 04/13/2005 | A-1 Materials Inc | 33.00 | 1 |
| 02/23/2005 | 02/23/2005 | A-1 Materials Inc | 7.00 | 1 |
| 11/30/2004 | 11/30/2004 | A-1 Materials Inc | 8.00 | 1 |
| 04/13/2004 | 04/13/2004 | A-1 Materials Inc | 8.00 | 1 |
| 06/02/2003 | 06/02/2003 | A-1 Materials Inc | 7.00 | 1 |
| 10/22/2002 | 10/22/2002 | A-1 Materials Inc | 2.00 | 1 |
| 06/17/2002 | 06/18/2002 | A-1 Materials Inc | 19.00 | 1 |
| 05/10/2001 | 05/11/2001 | A-1 Materials Inc | 12.00 | 1 |
| 06/14/2000 | 06/14/2000 | A-1 Materials Inc | 15.00 | 1 |