Wash Plant — Inspections

Total: 4 inspections

Begin End Operator Hours Inspectors
06/24/2025 06/25/2025 M & J Construction of Holt Inc 14.50 1
09/26/2007 09/26/2007 M & J Construction of Holt Inc 9.50 1
05/16/2007 05/16/2007 M & J Construction of Holt Inc 2.50 1
06/13/2006 06/13/2006 M & J Construction of Holt Inc 2.75 1