Wash Plant #3 — Inspections
Total: 4 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 08/19/2015 | 08/20/2015 | Knife River Corporation-North... | 31.50 | 1 |
| 08/19/2015 | 08/19/2015 | Knife River Corporation-North... | 0.25 | 1 |
| 09/09/2014 | 09/09/2014 | Knife River Corporation-North... | 5.50 | 1 |
| 11/06/2012 | 11/07/2012 | Knife River Corporation-North... | 23.00 | 1 |