Washplant — Inspections

Total: 6 inspections

Begin End Operator Hours Inspectors
08/24/2010 08/24/2010 Holz Crushing Inc 1.25 1
06/24/2003 06/24/2003 Holz Crushing Inc 6.00 1
10/18/2002 10/18/2002 Holz Crushing Inc 2.00 1
09/24/2002 09/24/2002 Holz Crushing Inc 10.00 1
07/11/2001 07/12/2001 Holz Crushing Inc 34.00 2
08/08/2000 08/10/2000 Holz Crushing Inc 12.00 1