Watertown Plant — Inspections
Total: 59 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 09/25/2003 | 09/26/2003 | Heidelberg Materials Northeast... | 20.00 | 2 |
| 01/29/2003 | 01/29/2003 | Heidelberg Materials Northeast... | 3.00 | 1 |
| 01/28/2003 | 01/30/2003 | Heidelberg Materials Northeast... | 21.00 | 1 |
| 10/22/2002 | 10/22/2002 | Heidelberg Materials Northeast... | 1.00 | 1 |
| 07/24/2002 | 07/25/2002 | Heidelberg Materials Northeast... | 20.00 | 1 |
| 03/28/2002 | 03/28/2002 | Heidelberg Materials Northeast... | 2.00 | 1 |
| 03/27/2002 | 03/28/2002 | Heidelberg Materials Northeast... | 12.00 | 1 |
| 10/24/2000 | 10/24/2000 | Heidelberg Materials Northeast... | 13.00 | 1 |
| 02/15/2000 | 02/16/2000 | Heidelberg Materials Northeast... | 28.00 | 1 |