Waverly Pit — Inspections

Total: 9 inspections

Begin End Operator Hours Inspectors
06/09/2025 06/09/2025 JLC Materials Inc. 12.25 1
09/10/2024 09/10/2024 JLC Materials Inc. 6.75 1
11/01/2023 11/01/2023 JLC Materials Inc. 12.50 1
05/03/2023 05/04/2023 JLC Materials Inc. 5.75 1
06/22/2022 06/22/2022 JLC Materials Inc. 5.50 1
08/11/2021 08/11/2021 JLC Materials Inc. 3.75 1
08/19/2020 08/19/2020 JLC Materials Inc. 8.00 1
07/15/2020 07/15/2020 JLC Materials Inc. 3.50 1
07/08/2020 07/08/2020 JLC Materials Inc. 6.25 1