West Cameron Operation — Inspections
Total: 9 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/07/2011 | 06/07/2011 | Twin Banks Coal Co. | 6.00 | 1 |
| 03/30/2011 | 03/30/2011 | Twin Banks Coal Co. | 4.00 | 1 |
| 07/12/2010 | 07/12/2010 | Twin Banks Coal Co. | 6.25 | 1 |
| 03/20/2010 | 03/20/2010 | Twin Banks Coal Co. | 3.50 | 1 |
| 12/26/2009 | 12/26/2009 | Twin Banks Coal Co. | 8.00 | 1 |
| 12/14/2009 | 12/14/2009 | Twin Banks Coal Co. | 2.75 | 1 |
| 10/19/2009 | 10/26/2009 | Twin Banks Coal Co. | 3.50 | 1 |
| 09/04/2009 | 09/10/2009 | Twin Banks Coal Co. | 5.50 | 1 |
| 03/20/2009 | 03/30/2009 | Twin Banks Coal Co. | 11.00 | 1 |