West Cameron Operation — Inspections

Total: 9 inspections

Begin End Operator Hours Inspectors
06/07/2011 06/07/2011 Twin Banks Coal Co. 6.00 1
03/30/2011 03/30/2011 Twin Banks Coal Co. 4.00 1
07/12/2010 07/12/2010 Twin Banks Coal Co. 6.25 1
03/20/2010 03/20/2010 Twin Banks Coal Co. 3.50 1
12/26/2009 12/26/2009 Twin Banks Coal Co. 8.00 1
12/14/2009 12/14/2009 Twin Banks Coal Co. 2.75 1
10/19/2009 10/26/2009 Twin Banks Coal Co. 3.50 1
09/04/2009 09/10/2009 Twin Banks Coal Co. 5.50 1
03/20/2009 03/30/2009 Twin Banks Coal Co. 11.00 1