West Side Pit — Inspections
Total: 54 inspections
| Begin | End | Operator | Hours | Inspectors |
|---|---|---|---|---|
| 06/05/2007 | 06/05/2007 | M.R. Tanner Mining Inc | 0.50 | 1 |
| 01/22/2007 | 01/23/2007 | M.R. Tanner Mining Inc | 8.25 | 1 |
| 02/27/2006 | 02/27/2006 | M.R. Tanner Mining Inc | 5.00 | 1 |
| 12/15/2005 | 12/15/2005 | M.R. Tanner Mining Inc | 9.00 | 1 |