Westlake Plant — Inspections

Total: 10 inspections

Begin End Operator Hours Inspectors
04/16/2003 04/17/2003 M-I L L C 19.00 1
10/29/2002 10/30/2002 M-I L L C 11.00 1
04/11/2002 04/11/2002 M-I L L C 0.00 0
02/25/2002 02/26/2002 M-I L L C 6.00 1
11/15/2001 11/15/2001 M-I L L C 0.00 0
06/06/2001 06/06/2001 M-I L L C 6.00 1
06/05/2001 06/06/2001 M-I L L C 18.00 1
10/17/2000 10/20/2000 M-I L L C 24.00 1
07/11/2000 07/14/2000 M-I L L C 3.00 1
06/28/2000 07/03/2000 M-I L L C 25.00 1