White Oak No. 1 — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
06/10/2009 06/19/2009 White Oaks Mining, Inc. 3.00 1
12/12/2008 12/16/2008 White Oaks Mining, Inc. 6.50 1
08/13/2008 08/13/2008 White Oaks Mining, Inc. 4.50 1
04/01/2008 04/01/2008 White Oaks Mining, Inc. 5.50 1
03/06/2008 03/31/2008 White Oaks Mining, Inc. 64.50 1
06/12/2007 07/18/2007 White Oaks Mining, Inc. 28.50 1
03/20/2007 03/30/2007 White Oaks Mining, Inc. 11.00 1