Wilco Plant — Inspections

Total: 7 inspections

Begin End Operator Hours Inspectors
10/14/2025 10/15/2025 Little River Materials 11.00 1
05/15/2025 06/09/2025 Little River Materials 12.75 1
05/08/2025 05/13/2025 Little River Materials 18.50 1
01/07/2025 01/14/2025 Little River Materials 19.00 1
09/23/2024 09/25/2024 Little River Materials 22.00 1
12/29/2023 12/29/2023 Little River Materials 8.00 1
03/07/2023 03/07/2023 Little River Materials 5.50 1