Williamstown Highwall Operation — Inspections

Total: 3 inspections

Begin End Operator Hours Inspectors
03/23/2009 03/23/2009 Meadowbrook Coal Co Inc 6.50 1
10/02/2006 10/19/2006 Meadowbrook Coal Co Inc 12.50 1
07/12/2006 07/12/2006 Meadowbrook Coal Co Inc 6.00 1