Willow Lake Portal — Inspections

Total: 1,031 inspections

Begin End Operator Hours Inspectors
04/04/2002 06/27/2002 Big Ridge Inc 261.50 1
04/01/2002 04/11/2002 Big Ridge Inc 57.00 1
04/01/2002 04/17/2002 Big Ridge Inc 80.00 2
03/18/2002 05/13/2002 Big Ridge Inc 123.50 2
03/15/2002 07/29/2002 Big Ridge Inc 22.00 3
03/11/2002 03/14/2002 Big Ridge Inc 22.50 1
03/04/2002 03/04/2002 Big Ridge Inc 8.00 1
02/28/2002 02/28/2002 Big Ridge Inc 8.00 1
02/13/2002 02/19/2002 Big Ridge Inc 20.00 1
02/06/2002 02/15/2002 Big Ridge Inc 11.50 1
02/05/2002 02/06/2002 Big Ridge Inc 19.50 1
01/22/2002 01/25/2002 Big Ridge Inc 32.50 1
01/02/2002 03/29/2002 Big Ridge Inc 185.00 4
12/04/2001 12/04/2001 Big Ridge Inc 7.00 1
11/20/2001 03/06/2002 Big Ridge Inc 26.50 2
11/03/2001 11/03/2001 Big Ridge Inc 8.00 1
10/24/2001 10/24/2001 Big Ridge Inc 8.00 1
10/22/2001 10/22/2001 Big Ridge Inc 16.00 2
10/09/2001 12/12/2001 Big Ridge Inc 26.00 3
10/09/2001 10/09/2001 Big Ridge Inc 4.50 1
09/06/2001 09/29/2001 Big Ridge Inc 26.00 1
08/14/2001 08/14/2001 Big Ridge Inc 8.50 1
07/30/2001 07/31/2001 Big Ridge Inc 20.50 1
06/20/2001 06/27/2001 27.50 1
05/29/2001 05/29/2001 8.00 1
05/22/2001 06/14/2001 21.00 1
04/16/2001 04/16/2001 8.00 1
03/26/2001 03/26/2001 10.00 1
03/22/2001 03/26/2001 18.00 1
02/28/2001 03/01/2001 9.75 1
01/26/2001 01/26/2001 6.75 1